Greenfield’s were awarded the contract to install a new 500kw Herz biomass system, to replace the troublesome installed boilers and take advantage of the governments RHI scheme.
In addition to lowering the running costs of the college and the reduction of emissions compared to the fossil fuel alternatives.


Project: Stockton Riverside College
Duration: 8 weeks
Value: £215k
Main contractor: Schneider Electric UK
Details:

  • Biomass design and build
  • 500kw Herz biomass boiler
  • 6000lt buffer vessels
  • District heat meter installation