Nunnick Hall Estates

Greenfields were awarded the contract to install a new 199kw Herz biomass system, to replace the the individual installed boilers with a district heating scheme and take advantage of the governments RHI scheme as well as  lowering the running costs of the estate and the reduction of emissions compared to the fossil fuel alternatives.

Project details:
Project: Nunnick Hall Estates
Duration: 8 weeks
Value: £165k
Main contractor: Nunnick Hall Estates
Details:

  • Biomass Design and Build
  • 199kw Herz biomass boiler
  • 3000lt buffer vessels
  • District heat meter installation
  • LED lighting, fire alarm, intruder alarm

IMG_0588

Comments are closed.
Greenfields Heat and Power