Greenfield’s were nominated to design and build the new flagship office and workshop building for AST signs, comprising of a full heat recovery ventilation system and a well-planned and installed cable and pipe runs as most of the installation is on display and became a design feature of the building.
Project: AST Signs
Duration: 26 weeks
Value: £315k
Main contractor: Greenfields (Greenfields took over main contractor duties once building was weather tight)
Details:
- Full M & E design and build
- Thermal wheel heat recovery system
- Underfloor heating to office areas
- Hot water heat recovery
- Cables and pipe work an aesthetic feature